These calls were left out of 4d7cea3d2e. In the InPlaceDispatcher test case
the operation is a no-op, but it's good form to include it. In the
DynamicThreadPoolTaskDispatcher test the shutdown call is required to ensure
that we don't exit the test (and tear down the dispatcher) before the thread
running the dispatch has completed.
1.1 KiB
1.1 KiB